Operations
Where are ships waiting, for how long, and how much tonnage is coming?
Ships stopped at anchor now and how long they have waited.
Tonnage due to arrive in the next 72 hours.
Typical waits over the last 60 days.
Deep-sea ships at anchor
195Ships
11.0 Mt DWT
history building: 0 of 3 days
DWT (Deadweight Tonnage) at anchor
11.0 Mt
history building: 0 of 3 days
Median time at anchor so far
14 h
184 ships
history building: 0 of 3 days
Ships due in 24 h
292Ships
619 Ships in the 72 h window
history building: 0 of 3 days
Hours each ship has been at its current anchorage, from its declared movement log.
Raw material of a congestion index; needs weeks of 10-minute history to define 'normal'.
06 Oct 2026 – 08 Oct 07:24 UTC|Queue and data age per position snapshot
MPA due-to-arrive list by declared ETA, 6-hour blocks. Far blocks are softer: ETAs move.
08 Oct 2026 – 11 Oct 01:00 UTC|GT (Gross Tonnage) due in the next 72 h
Deep-sea ships stopped in each anchorage group, by segment.
Hours from arrival to first berth for deep-sea ships that anchored first.
| Bulk | 22 | 10 h | 24 h | 97 h |
| Gas Carrier | 30 | 8.7 h | 25 h | 67 h |
| Container | 122 | 3.8 h | 26 h | 63 h |
| Oil/Chem Tanker | 354 | 10 h | 30 h | 106 h |
| General/Roro/Car | 33 | 14 h | 38 h | 146 h |
Each against its own normal range: unusual = outside the 10th-90th percentile.
| Deep-sea ships at anchor | BUILDING | 195 Ships | – |
| DWT (Deadweight Tonnage) at anchor | BUILDING | 11.0 Mt | – |
| Median time at anchor so far | BUILDING | 14 h | – |
06 Oct 2026 – 08 Oct 07:24 UTC|Every signal now against its normal range